Calculator

Paver Calculator

Counts pavers with a cutting allowance, sizes the compacted base at the association's minimum and the 1-inch bedding sand, and totals it at your prices.

Written by DueRivaSources checked: 2026-09-26Review standard

Pavers = area × 144 ÷ (paver length × width) × (1 + waste). Base and sand are the exact compacted and screeded volumes.

Paver size

Surface

Area
120 sq ft
Pavers
594
Base, compacted
1.48 yd³ · 3.0 t
Bedding sand, 1 in
0.37 yd³ · 0.4–0.7 t
Edge restraint
44 ft

Your local prices

From a store shelf or a quote. YardPermit fills in no price.

Materials: enter a price to see the total.

Installed: enter a price to see the total.

The paver calculator counts the pavers for a rectangular patio, walk or driveway, then sizes the two layers under them: the compacted aggregate base and the bedding sand. The depths come from the installation guide of the Concrete Masonry & Hardscapes Association.

It is a takeoff for a rectangle on a well-drained site. Curves, steps and slopes change the count, and wet or weak soil changes the base, which is then a design question.

How to use it

  1. 01

    Enter the size

    Length and width in feet. For an L-shape, run each rectangle and add the results.

  2. 02

    Pick the paver size

    The face size in inches. The count is the area divided by the face of one paver, so a 4-by-8 paver is 4.5 to the square foot and a 12-by-12 is one.

  3. 03

    Choose patio or driveway

    The association's guide calls for at least 4 inches of compacted base under patios, sidewalks and pedestrian areas on well-drained soil, and at least 6 under residential driveways. Colder climates and wet or weak soils need more; the slider goes to 12.

  4. 04

    Set the waste on pavers

    Ten percent by default, for the cuts at the edges. Base and sand get no allowance here because they are not cut; the gravel calculator adds one to a base if you want it.

How the math works

Pavers

Pavers = area × 144 ÷ (paver length × width in inches) × (1 + waste), rounded up. A 12-by-10 patio in 4-by-8 pavers is 540 pavers net and 594 with ten percent waste.

Base

Cubic yards = area × (base depth ÷ 12) ÷ 27; tons = cubic yards × 2.03, the Tennessee DOT's estimating factor for dense-graded aggregate base per compacted cubic yard. The same patio on a 4-inch base needs 1.48 cubic yards, about 3.0 tons.

Bedding sand

Cubic yards = area × (1 ÷ 12) ÷ 27, for the nominal inch the guide calls for. The weight is a range from the FHWA table for clean sand graded fine to coarse, loosest to densest: the example needs 0.37 cubic yards, 0.42 to 0.69 tons.

Edge restraint

The perimeter, 2 × (length + width). The guide wants at least an inch of restraint in contact with the side of the paver; count only the edges that do not already sit against a wall or a curb.

Where the number goes wrong

  • Paving a driveway on a patio base. The guide's minimum for a residential driveway is 6 inches of compacted base, not 4.
  • Screeding the bedding sand thicker to hide an uneven base. The unevenness reflects through to the surface over time; fix the base.
  • Bedding pavers in stone dust or masonry sand. The guide rules both out and names concrete sand meeting ASTM C33.
  • Laying the surface flat. The guide sets slopes at a minimum of 1.5 percent.
  • Digging before utilities are marked. The guide says to have lines located before excavating; call 811 a few days ahead.

Questions people ask

How many pavers do I need per square foot?

144 divided by the face of one paver in square inches: 4.5 for a 4-by-8, 4 for a 6-by-6, 2.67 for a 6-by-9, 1 for a 12-by-12 and 0.56 for a 16-by-16. Add a cutting allowance on top.

How deep should the base be under pavers?

The association's installation guide: at least 4 inches compacted under patios and walks on well-drained soil, at least 6 under residential driveways, and more in cold climates or on wet or weak soil.

How thick are pavers for a driveway?

The guide says pedestrian areas, driveways and areas with limited vehicle use are paved with units 2⅜ inches (60 mm) thick; streets and industrial pavements need at least 3⅛ inches.

Keep planning