Retaining Wall planning guide

Plan a retaining wall: height counted from the footing, the 4 ft permit line, when it needs an engineer, and the drainage stone that goes behind it.

Written by DueRivaLast reviewed: 2026-09-27Review standard

Permit complexity

High

Compare quotes per

square foot of wall face

Construction laborersSOC 47-2061 · hourly wage · May 2025 · BLS · every stateA wage for employees, not a price.
PercentileU.S.CaliforniaTexas
25th percentile$18.57$23.15$17.66
Median$22.66$28.98$19.53
75th percentile$28.72$37.75$22.57

Why there is no price here

Retaining wall buying path

Measure from the footing, then follow the water.

Two walls with the same face can differ by a permit and an engineer: what counts is the height from the bottom of the footing, the load above, and where the water behind it goes.

01 · Measure

Count what is buried

Take the height from the bottom of the footing to the top of the wall at its tallest point. That is the number the permit line reads, not the face you see.

02 · Load

List what sits above

A driveway, parking or a building on the soil above is a surcharge, which ends the exemption and, past 24 inches, calls for an engineered design. Settle what the wall carries before choosing the block.

03 · Drain

Plan where the water goes

Send surface water away from the wall first. Behind a block wall the concrete-masonry guide calls for at least 12 inches of free-draining stone and a drain pipe of 3 inches or more, with outlets no more than 50 feet apart.

Decision matrix

Compare one specification at a time

Segmental block

A wall built without mortar or forms

Specify the block system, leveling pad, drainage stone depth, drain pipe and any geogrid layers.

Poured concrete

A thin wall where space is tight

Specify footing size, reinforcement, wall thickness, weep holes and the waterproofing on the back.

Timber

A short wall around a garden bed

Specify ground-contact treatment, anchors or deadmen, post spacing and how water gets through.

Quote controls

Keep every bid comparable

  • Same length, height from the footing and top detail
  • Excavation, base and footing depth itemized
  • Drainage stone depth, drain pipe size and outlet locations shown
  • Engineering, permit and grading responsibility assigned
  • Soil hauled off or brought in, in cubic yards

Next best action

Calculate, then lock the scope.

Size the drainage stone along the wall's length in the gravel calculator, then have every bidder price the same footing depth, wall height and drain line.

Start with two separate questions

No permit under the model code up to 4 ft from the bottom of the footing, unless the wall supports a surcharge.

Where it stands and what it does to the neighbor's grade are zoning and grading questions; settle both before digging.

What usually decides the scope

  • Height from the bottom of the footing
  • Load on the soil above it
  • Soil type and drainage
  • Depth of cut or fill
  • Property-line location

Height

The model code, Austin and Los Angeles read the 4-foot line from the bottom of the footing to the top of the wall, so the buried courses count as much as the face you see.

Drainage

The concrete-masonry guide treats the stone and pipe behind a block wall as relief for incidental water, not its main drain: water should be sent away from the wall before it gets there.

PROPERTY LINEHOUSESIDEFRONTREARSHED
Educational diagram. Distances are not your zoning table.

Use the dimensions, not a guess

Related field notes